Flossie Insulation

March 24th, 2013 | by m1bxf |

Back in September 2012 Joe M0ZRN and Gavin M1BXF started insulating the roof on Flossie as at times on UKAC’s it got a little chilly.  The walls have wood panels so have some insulation already.

Joe donated some thin wood panel which we cut to size to fit the spaces in the roof.

DSC_1059DSC_1066DSC_1069

DSC_1064DSC_1072DSC_1061

To hold it all in place we mounted 4 lengths of electrical conduit the length of the roof.

DSC_1074DSC_1076DSC_1075

DSC_1031DSC_1033

Before we mounted the wooden panels we put pipe insulation in the top side to act as air traps.  As expected with Camb-Hams we used hot melt glue to hold this in place.

DSC_1050DSC_1051DSC_1043DSC_1040

Tags:

Sorry, comments for this entry are closed at this time.